Powering your projects with the best design products.

St Aidan’s Anglican Girls School

With renewed emphasis on collaboration and active participation, Cox Architecture was engaged to renovate St Aidan’s Anglican Girls School’s existing arts precinct – originally built in the 1960s – into the new Innovation and Design Hub.



BY

April 18th, 2018


Architect: Cox Architecture

Project Manager: ID Construction Professionals

Builder: GCB Construction

Structural Engineer: Bligh Tanner

Services Engineer: Greenleaf

 

Duration: 9 months

Budget: $3.5m

 

Lighting

Tecton KK 3000 lighting, Zumtobel. Wall luminaire, BEGA.

 

Finishes

‘La Paloma Grande’ bricks, Brickworks. Carpet, Interface. ‘NaturAL Reflect 405’ façade, Alucobond. Paint throughout, Dulux.


INDESIGN is on instagram

Follow @indesignlive

The Indesign Collection

A searchable and comprehensive guide for specifying leading products and their suppliers

While you were sleeping

The internet never sleeps! Here's the stuff you might have missed