Atlassian Central by SHoP Architects and BVN has reached its full structural height, marking a construction milestone for the 39-storey commercial tower in Sydney.
July 23rd, 2026
Atlassian Central in Sydney has reached its full structural height, marking a construction milestone for the 39-storey commercial tower that combines mass timber with steel and concrete. According to the project team, the building is now the world’s tallest hybrid timber tower, standing more than 180 metres tall.
Developed by Dexus and co-owned with Atlassian, the tower has been designed by SHoP Architects and BVN, with construction delivered by Built in a joint venture with Obayashi Corporation. The project will serve as Atlassian’s Australian headquarters.

The building uses a hybrid structural system that combines mass timber, steel and concrete. The approach reduces the amount of concrete and steel required while maintaining the structural performance needed for a high-rise commercial building. The project is targeting a 50 per cent reduction in upfront embodied carbon compared with a conventional premium office tower, along with a 50 per cent improvement in operational energy efficiency compared with a standard 5 Star NABERS base building.
The workplace has been organised around seven four-storey timber ‘habitats,’ designed to increase access to natural light, ventilation and shared spaces. Other sustainability targets include operation on renewable electricity from completion, a 6 Star Green Star rating, Platinum LEED and WELL Core certifications, and a 5.5 Star NABERS Energy Commitment.
Related: AIA National shortlist announced for 2026 awards

With the structural frame complete, work will continue on the façade and building services ahead of practical completion, which is scheduled for late 2026. The $1.45 billion project has involved approximately 10,000 cubic metres of timber, 8,000 tonnes of structural steel and 30,000 cubic metres of green concrete.
“Reaching the topping out of Atlassian Central is a truly momentous occasion,” says Andreia Teixeira, Associate Principal at SHoP. “SHoP has been privileged with the opportunity to design such an innovative project — one that we believe will redefine how people come together, collaborate and create in Sydney and beyond. We are incredibly proud of what this exceptional team has achieved, and we look forward to seeing this building take its place as a landmark of the city. It’s particularly rewarding to begin experiencing the spatial qualities of a high-rise that reimagines a natural habitat within an urban tower — connecting people to each other, nature and to the city around them. We’re excited by how this concept sets a new benchmark for sustainability, where timber, landscape and natural ventilation come together to shape a more holistic work-life experience and inspire future innovation.”

Peter Titmuss, Principal at BVN, comments: “With its structure now standing at full height above Sydney’s skyline, Atlassian Central is the world’s tallest hybrid timber tower; an innovative workplace that halves embodied carbon and embeds renewables in a way once considered impossible. Achieving this milestone has been both demanding and rewarding, only made possible through constant design innovation and collaboration across the whole project team. Hybrid mass timber has done more than reduce embodied carbon, it has fundamentally shaped how tower buildings can be delivered, enabling prefabrication, dry construction and a faster, lighter vertical build. As a prototype for mass-timber towers of the future, this is a moment of global significance.”
SHoP Architects
shoparc.com
BVN
bvn.com.au


INDESIGN is on instagram
Follow @indesignlive
A searchable and comprehensive guide for specifying leading products and their suppliers
Keep up to date with the latest and greatest from our industry BFF's!
In the last instalment of our three-part performance seating series, Alex Bain from Architectus explains why sitting well shouldn’t feel like sitting at all and explores an unexpected success metric of the hybrid workplace: the grounding power of emotional support.
At 3daysofdesign 2026, AHEC’s immersive exhibition traced the journey of American hardwood from forest to finished product.
The Geelong College’s Sport and Wellbeing Centre ‘Belerren’ designed by Wardle is designed around bringing in natural light. But Shade Factor’s job was to help modulate and precisely control it for the most important competitive moments.
From an overnight concert beneath the Royal Exhibition Building’s dome to light works along the Birrarung and a full-scale takeover of Melbourne Town Hall, Now or Never returns with a program that treats the city itself as a stage.
Shortlisted in the 2026 INDE.Awards are a plethora of projects from Singapore and the Singapore Institute of Architects’ members. We celebrate the talent that resides in this country, as we showcase design that crosses borders and resonates in our Indo-Pacific region.
The internet never sleeps! Here's the stuff you might have missed
After two decades of creative partnership, Kim Colin and Sam Hecht of Industrial Facility step into a joint role as Herman Miller’s Global Creative Directors – a reminder that the brand’s ethos isn’t defined solely by their products, but also by the quiet thread of thought that shapes the space in-between, crafting a purposeful, human-centric and enduring trajectory.
From an overnight concert beneath the Royal Exhibition Building’s dome to light works along the Birrarung and a full-scale takeover of Melbourne Town Hall, Now or Never returns with a program that treats the city itself as a stage.