Architect: Cox Architecture
Project Manager: ID Construction Professionals
Builder: GCB Construction
Structural Engineer: Bligh Tanner
Services Engineer: Greenleaf
Duration: 9 months
Budget: $3.5m
Lighting
Tecton KK 3000 lighting, Zumtobel. Wall luminaire, BEGA.
Finishes
‘La Paloma Grande’ bricks, Brickworks. Carpet, Interface. ‘NaturAL Reflect 405’ façade, Alucobond. Paint throughout, Dulux.




